‚Äč

As of 7/01/19

Raised: $40,944.17

Still need:

$1,539,846.83

                  Total Project Budget:                         $1,580,791.00

 

Building Costs Budget:                       $1,250,000.00

  • Includes the following:

    • Building Utilities – Water, Sewer, Electric, Gas

    • Building Concrete Slab/Foundation

    • Pre-Engineered Metal Building Purchase of Plans and Building

    • Pre-Engineered Metal Building Erection

    • Interior Framing

    • Interior Finishes

    • Mechanical

    • Electrical

    • Plumbing

    • Asphalt Parking Lot

    • Site work, Sidewalk and Landscaping

 

Ancillary Costs Budget:                      $330,791.00

  • Includes the following:

    • Design Fees

    • Site Survey

    • Geotechnical Engineering and Construction

    • Permitting Fee

    • Fire Suppression Design & Permitting

    • FF&E (Furniture, Fixtures & Equipment)

    • Project Contingency 